BIM Facility Management:Design and Operation with IoT

BIM in Facility Management: The Emerging Role of Digital Modelling in Operations
While Building Information Modelling (BIM) has gained traction in the design and construction of large-scale, complex projects, its application within the operational phase of a building's life remains an emerging frontier. For many in the industry, the transition from traditional paper-based or 2D digital records to a 3D data-rich environment is a significant shift that is only just beginning to take shape.
The integration of BIM into facility management (FM) represents a move towards linking real-time operational data with static architectural models. When implemented, this process allows property managers to move beyond simple visualisations, creating a digital representation of the building that can support decisions regarding occupant comfort, safety, and energy efficiency.
The Current State of BIM in Facility Management
Historically, building information modelling was viewed almost exclusively as a tool for the design and construction phases. Its primary use was to help architects and engineers coordinate complex systems and prevent physical clashes during building. Once construction was finished, these models were frequently archived rather than handed over as functional tools for the building's occupiers.
However, the conversation around smart buildings is starting to reposition BIM as a potential database for facility management. In theory, a BIM model can house vital information about a building's components—such as HVAC specifications, electrical circuit layouts, and plumbing details—all within a single digital location.
Exploring the "7D" Dimension of BIM
In the technical framework of BIM, the "7D" dimension refers specifically to the inclusion of facility management and lifecycle data. While 3D models are common, 7D is still relatively rare in practice. It aims to provide:
- Centralised Asset Records: Consolidating maintenance manuals, warranties, and service histories within the digital model.
- Lifecycle Modelling: Using installation dates and manufacturer data to predict when equipment might require servicing or replacement.
- Space Utilisation: Mapping how physical spaces are used to help optimise floor plans and reduce energy waste in unoccupied areas.
Potential Impacts on Operational Efficiency
The theoretical driver for adopting BIM in facility management is the reduction of "information waste." Currently, facility teams often spend a considerable amount of time searching for technical data or locating assets behind walls and ceilings.
- Maintenance Access: A digital model can show a technician exactly where a valve or damper is located before they arrive on-site.
- Planned Maintenance: By knowing the exact age and specification of an asset, teams can move away from reactive "fix-on-fail" models towards more structured maintenance.
- Energy Analysis: Models can be used to simulate how changes to a building’s facade or HVAC setpoints might impact overall energy consumption.
The Challenges of Adoption: Static Models and Data Gaps
The primary reason BIM is not yet widely used in facility management is the difficulty of keeping models accurate. Most BIM files are "as-designed" or "as-built," meaning they reflect the building at the moment of completion. As soon as a tenant moves a wall or a pump is replaced, a static model becomes outdated.
Bridging the "Data Gap"
The "Data Gap" describes the disconnect between the original design intent and how a building actually performs day-to-day. For example, a ventilation system may be designed to provide a specific airflow, but sensor data might show it is performing differently in reality.
To bridge this gap, the model must be connected to the building’s physical systems—such as boilers and meters. This requires a level of digital connectivity that many older or even mid-aged buildings currently lack.
The Interoperability Hurdle
Interoperability remains the most significant technical barrier. Most buildings contain a fragmented mix of hardware: a chiller might use BACnet, a meter might use Modbus, and a heat sensor might use LoRaWAN.
For BIM to be useful in FM, these different "languages" must be unified so the data can flow into the model. Without a way to centralise this information, the data remains trapped in proprietary systems, making a comprehensive digital twin difficult to achieve.
The Future of Data-Driven FM in the UK
As the UK introduces stricter regulations regarding energy performance and the "Golden Thread" of building safety information, the industry is looking more closely at digital record-keeping. While full BIM integration is not yet the standard, the move towards more interoperable, data-driven facility management is clearly underway.
By focusing on better data collection and system connectivity, managers can ensure that their maintenance decisions are based on the actual state of the building. Whether through a full BIM model or a simpler digital dashboard, the goal remains the same: improving the long-term sustainability and efficiency of the UK’s built environment.
Want to learn more about the Wattsense connectivity solution?
Discover our solutionContinue reading

Understanding RdSAP Software and Data Collection for Energy Efficiency


